工厂车间整体除尘设备的日常维护保养
来源:https://www.sdcjtz.com/ 发布时间:2023-07-19
1、技术人员应了解车间整体除尘设备的基本原理,特性,应用标准,并熟练掌握调整和维修方式。
1. Technicians should understand the basic principles, characteristics, application standards, and proficiently master the adjustment and maintenance methods of the overall dust removal equipment in the workshop.
2、减速机,输灰装置等分子热运动构件应按规定加油和换油,发觉有异常情况应及时排除。
2. The reducer, ash conveying device and other molecular Thermal motion components shall be refueled and replaced as required, and any abnormal condition shall be eliminated in time.
3、储气罐,气源三联件中的油水分离器应每组排污一次,同时油水分离器应每间隔3~6月清理一次,油雾器应时常查验存油状况,及时给油。
3. The oil water separator in the air storage tank and air source triplet should be drained once per group, and the oil water separator should be cleaned every 3-6 months. The oil mist collector should regularly check the oil storage status and provide oil in a timely manner.
4、电磁脉冲阀如出现故障,应及时地排除,如内部有残渣,水份,应完成清除,如膜片损坏应及时拆换。
4. In case of fault of Electromagnetic pulse valve, it shall be removed in time. If there is residue and moisture inside, it shall be removed. If the diaphragm is damaged, it shall be removed and replaced in time.
5、应用按时式清灰控制板,应定时测量清灰周期是不是准确,不然应做好调整。应用定阻式脉冲控制仪,应按时检查压力开关的工作情况,测压口是不是阻塞,并完成清除。
5. When using a timely ash cleaning control board, it is necessary to regularly measure whether the ash cleaning cycle is accurate, otherwise adjustments should be made. When using a constant resistance pulse control instrument, the working condition of the pressure switch should be checked on time, the pressure tap should be checked for blockage, and the removal should be completed.
6、按时测量工艺主要参数,如烟尘量,溫度,浓度值等,出现异常,应找到根本原因并妥善处理。
6. Measure the main parameters of the process on time, such as smoke and dust amount, temperature, concentration value, etc. If any abnormalities occur, the root cause should be found and properly handled.
7、启动时,应先接入压缩空气至储气罐,接入操纵电源,运行排灰装置,假如系统中还有其他设备,应先运行下游设备。
7. When starting, compressed air should be connected to the air storage tank, the control power should be connected, and the ash discharge device should be operated. If there are other equipment in the system, downstream equipment should be operated first.
8、关机时,在工艺系统终止以后,应维持除尘设备和专业再次工作中一段时间,以除尘设备内的潮气和粉尘。
8. When shutting down, after the process system is terminated, the dust removal equipment and profession should be maintained in operation for a period of time to remove moisture and dust from the equipment.
务必留意的是,在除尘设备停止工作时,务必不断对除尘设备开展清灰(可以用手动式清灰),将除尘滤袋上的粉尘祛除,防止受潮气危害而糊袋子。更多相关事项就来我们网站http://www.sdcjtz.com咨询吧!
It is important to note that when the dust removal equipment stops working, it is necessary to continuously clean the dust removal equipment (manual cleaning can be used), remove the dust from the dust removal filter bag, and prevent the bag from being damaged by moisture. For more related matters, come to our website http://www.sdcjtz.com Consult!